皇冠官方app(www.hg108.vip):Fukushima debris removal delayed by another year

皇冠体育开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠体育开户的平台。皇冠体育开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。