PETRONAS and DNV sign MoU for carbon capture utilisation, storage

环球视讯www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

According to DNV, the MoU was inked on July 8, 2022, between PETRONAS senior general manager of carbon management Emry Hisham Yusoff and DNV vice-president and regional director (Asia-Pacific energy systems) Brice Le Gallo.

KUALA LUMPUR: Petroliam Nasional Bhd (PETRONAS) has signed a memorandum of understanding (MoU) with DNV, an independent expert in risk management and assurance.

The tie-up is to address the technical, regulatory and business challenges of carbon capture utilisation and storage (CCUS) deployment.

In a statement, DNV said the two parties plan to collaborate on initiatives and activities related to CCUS deployment by leveraging each organisation’s technical skills, resources and research capabilities.

The scope of collaboration covers technical matters (including safety, environment, risk, technology and the qualification of storage sites), legislation and regulation, capability development and commercial areas.

,

www.a55555.netwww.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

,

According to DNV, the MoU was inked on July 8, 2022, between PETRONAS senior general manager of carbon management Emry Hisham Yusoff and DNV vice-president and regional director (Asia-Pacific energy systems) Brice Le Gallo.

DNV business development head (CCUS, energy systems) Jamie Burrows said the collaboration will spur the advancement of CCUS not only in Malaysia but across the region.

“CCUS will play a crucial role in Asia’s energy transition. Through this initiative, we aim to address a number of areas fundamental to the establishment of regional hubs and thereby enable greater access to CCUS infrastructure,” he added.

This project, which enables the capture of carbon dioxide emissions from industrial activities, could play a crucial role in South-East Asia’s transition to net zero, DNV said. — Bernama


转载说明:本文转载自Sunbet。

  • 评论列表:
  •  USDT充提教程(www.6allbet.com)
     发布于 2022-09-12 00:48:04  回复
  • “We are able to leverage on our technical knowledge and expertise in the engineering, procurement, construction and commissioning (EPCC) of solar PV facilities to expand our offerings into asset ownership of solar PV facilities.看文居然成瘾,哈哈

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。